ESC12-00539
| Tracking Control | 2/5/2013 | 2/5/2013 | 2/8/2013 10:09:20 AM | P | FAIL |
|
|
Spoke with RP: Construction entrance was improved 2/7/13; Will bring in more rock to increase construction entrance length to 50 ft on 2/9 and will perform street sweeping. Re-inspect scheduled for 2/12
|
ESC12-01128
| General Inspection | 2/5/2013 | 2/5/2013 | 2/6/2013 7:27:18 AM | | PASS |
|
|
|
ESC12-00926
| General Inspection | 2/5/2013 | 2/5/2013 | 2/6/2013 7:26:27 AM | | PASS |
|
|
Area has been returned to pre-existing conditions. Need to verify final stabilization is complete after snow melts.
|
ESC12-00974
| General Inspection | 2/5/2013 | 2/5/2013 | 2/6/2013 12:00:00 AM | | PART |
|
|
Spoke with RP. Grading is complete. Seed broadcasted in December. Notified RP that because of the cold winter, he should plan on re-seeding in the spring. Also will need to closely monitor the slope for additional stabilization practices and plan for the potential to provide a mulch cover.
|