BLD08-01293
| FIRE-Final Inspection | 2/5/2014 | 2/5/2014 | 2/5/2014 4:56:46 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD08-00378
| FIRE-Final Inspection | 2/5/2014 | 2/5/2014 | 2/5/2014 4:18:20 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR13-00524
| INSP-Final Inspection | 2/5/2014 | 2/5/2014 | 2/5/2014 4:11:41 PM | P | PART |
|
|
Overhead work approved for cover- plan modification verified.
|
BLD14-00175
| FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 2:46:28 PM | A | PASS |
|
|
Fire life safety okay pending EM lights are provided and fire extinguishers are posted at indicated locations. Items to be finished prior to structural final as discussed.
|
FIR13-00579
| INSP-Sprinkler Rough-in/Hydro | 2/4/2014 | 2/5/2014 | 2/5/2014 2:25:14 PM | A | PART |
|
|
Completed overhead hydrostatic test of the wet system 2nd floor west wing. Also completed cover inspection of the corridor drop ceiling, unit kitchens and bathroom ceilings. Noted exposed combustible construction above the ceiling lids to be covered with sheetrock.
|
BLD12-01914
| FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 11:51:58 AM | P | PART |
|
|
Fire life safety at the temporary storage room and soiled holding room passed inspection.
|
BLD13-03263
| FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 11:15:32 AM | A | PART |
|
|
On site discussion with contractor regarding completion of phase one work and area separation between phases to maintain fire protection.
|
FIR14-00036
| INSP-Sprinkler Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 11:12:20 AM | A | PART |
|
|
Okay to cover overhead work at the new changing room, new DSW heads at the outside beer cooler also okayed pending gap fill and escutcheons. *Noted six damaged pendent heads (existing) at the kitchen area to be replaced prior to final. C/N on site.*
|