BLD13-02236
| BLD-Conference | 2/5/2014 | 2/5/2014 | 2/5/2014 4:41:46 PM | P | PART |
|
|
jeff Phone #: ###-####,, on site with 2 plan reviewers
|
GCB13-00173
| GCB-Courtesy | 1/31/2014 | 2/5/2014 | 2/5/2014 4:23:42 PM | P | CANC |
|
|
Jed ###-#### Architectural analysis, call 1/2 hr prior
|
GCB13-00158
| GCB-Stem wall | 2/4/2014 | 2/5/2014 | 2/5/2014 4:21:38 PM | P | PART |
|
|
Nathan ###-#### hope to pour concrete @2PM,, will pour next week when weather warms,, ok work in progress
|
BLD13-02006
| BLD-Conference | 2/5/2014 | 2/5/2014 | 2/5/2014 3:56:07 PM | P | DONE |
|
|
Phone #: ###-#### >> Inspection requested via web by Dana Vance
|
BLD13-02248
| BLD-Framing/Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 3:47:04 PM | A | PASS |
|
|
abe Phone #: ###-####
|
BLD13-03422
| BLD-Framing/Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 3:05:21 PM | A | NR |
|
|
tommy Phone #: ###-####,, need elec and shear blocking,,, stair rise
|
BLD13-02236
| BLD-Framing/Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 2:36:52 PM | A | PART |
|
|
jeff Phone #: ###-####,, ok to insulate main house area.. NOT new area.. need fire blocking etc.
|
BLD14-00156
| BLD-Framing/Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 11:05:58 AM | A | PASS |
|
|
Larry Phone #: ###-####
|