BLD14-03135
| BLD-Framing/Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 3:36:28 PM | P | FAIL |
|
|
Keith// please call 30 min prior Phone #: ###-####. Cannot connect top of framing to grid, no box header present at top of glass or adequate connection for mullions. Provide new detail detail showing top of wall at glass and mullion connections, braced to structure above, leaving grid as independant system.
|
BLD14-03533
| BLD-Ceiling Grid Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 2:51:24 PM | P | PASS |
|
|
Dillon Phone #: ###-####
|
BLD15-00136
| BLD-Final | 2/4/2015 | 2/5/2015 | 2/5/2015 2:29:36 PM | P | PASS |
|
|
Marjie Phone #: ###-####
|
BLD15-00136
| DOC - Permit Finaled | 2/5/2015 | 2/5/2015 | 2/5/2015 2:29:09 PM | P | PASS |
|
|
|
BLD15-00136
| BLD-Conference | 2/4/2015 | 2/5/2015 | 2/5/2015 2:28:55 PM | P | PASS |
|
|
Marjie Phone #: ###-####
|
BLD14-02089
| BLD-Conference | 2/4/2015 | 2/5/2015 | 2/5/2015 11:12:25 AM | A | PASS |
|
|
Darin Phone #: ###-####
|
BLD14-02089
| BLD-Framing/Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 11:11:54 AM | A | PASS |
|
|
Darin Phone #: ###-####. Exterior steel stud framed walls, Structural steel. Also reviewed all special inspection reports to date.
|
BLD14-02274
| BLD-Conference | 2/4/2015 | 2/5/2015 | 2/5/2015 9:30:21 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD15-00270
| BLD-Final | 2/4/2015 | 2/5/2015 | 2/5/2015 8:50:16 AM | A | CANC |
|
|
Scott Phone #: ###-####
|
BLD15-00270
| BLD-Other | 2/5/2015 | 2/5/2015 | 2/5/2015 8:50:07 AM | A | PASS |
|
|
Scott Phone #: ###-####. Block and tie only ok.
|