ESC14-00273
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 4:40:32 PM | | PASS |
|
|
Hillside BMPS installed. WIP. No trackout, material spills or discharges observed. Project near completion.
|
ESC14-01184
| Site Preparation | 2/5/2015 | 2/5/2015 | 2/5/2015 4:24:58 PM | P | PART |
|
|
WIP. DI protection, concrete washout, and permit posting has been provided. Digging a large basement so will need to sweep up trackout when they backfill/haul off excess dirt.
No perimeter protection BMPs for all the dirt dug for basement and storm predicted for weekend. Will discuss with RP and reinspect. Currently no discharges or sediment leaving site, but could be a problem.
|
ESC13-00213
| Random Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 4:03:27 PM | P | PASS |
|
|
Work appears to have recently resumed around the site and the BLD was recently extended in December 2014. No trackout onto culdesce and hillsides appear stable with no rill or gully erosion. Need to establish if there is a new RP. No ESC corrections currently but did see dump trucks hauling away dirt currently and speeding through neighborhood area.
|
ESC14-00157
| General Inspection | 2/4/2015 | 2/5/2015 | 2/5/2015 2:46:29 PM | A | PASS |
|
|
|
ESC14-00239
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 1:47:30 PM | | PASS |
|
|
Drop inlets have filter protection. Trackout is being controlled. Vertical construction in progress. No corrections at this time.
|
ESC14-01129
| Random Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 11:59:26 AM | A | FAIL |
|
|
Sidewalk and gutter full of mud and dirt from vehicle and foot traffic.
CN issued to sweep up mess and restrict access on front of yard or lay boards over the mud until it dries. Mud is not yet migrating down gutter, but needs to be cleaned before weekend and more rain.
|
ESC14-01199
| Site Preparation | 2/5/2015 | 2/5/2015 | 2/5/2015 11:54:08 AM | A | PART |
|
|
Phone #: 2089144370 >> Inspection requested via mobile web by Bryan Millar
Permit is posted and most CBH projects within Drop Zone are free of trackout. Approved to start work.
Correction issued: No more site preps approved until a lined concrete washout with a sign is provided. Currently dumping at end of Ardyce and causing trackout and uncontained washout spreading across soil.
Notice given to RP Brett as well as Bryan listed above.
|
ESC13-00193
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 11:45:15 AM | | PART |
|
|
Site hillsides that have been tracked and hydroseeded, drainage divirsion channel and silt fence perimeter are preventing erosion and keeping sediment from leaving site
Corrections needed:
1. Clean out upper DI bag on entrance to culdesac and sweep up accumulated dirt and sand around inlet.
2. Assist in cleanup of illicit cement washout done by Somerset Village SFH contractors and post signage preventing more washout. Use designated pit.
|
ESC14-00723
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 11:07:38 AM | | PASS |
|
|
Home is complete and occupied. To be landscaped by homeowner. Site has been cleaned and soil level is below grade of sidewalk and curbing so is contained. ESC permit finaled. Jayo projects in Somerset Village ongoing so will continue to inspect regularly.
|
ESC14-00723
| DOC - Permit Finaled | 2/5/2015 | 2/5/2015 | 2/5/2015 11:05:49 AM | P | PASS |
|
|
|
ESC13-00666
| Aging Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 10:58:57 AM | | PASS |
|
|
Parking lot rehab and paving complete. No loose sediment or disturbed areas. Permit finaled.
|
ESC13-00666
| DOC - Permit Finaled | 2/5/2015 | 2/5/2015 | 2/5/2015 10:57:09 AM | P | PASS |
|
|
|
ESC14-00725
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 10:26:20 AM | | PASS |
|
|
WIP progress. Sediment containment BMPs on the lower side of home are keeping sediment from leaving site and going to canal right-of-way.
Permit posted on fence, trash container on site and no litter blowing around.
No corrections needed, site in compliance.
|
ESC14-00144
| Random Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 10:19:26 AM | A | PASS |
|
|
East Valley BMPs have been repaired and a new lined concrete washout provided. Workers and material delivery vehicles staying off muddy open areas.
|
ESC13-01024
| Aging Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 9:52:39 AM | | PASS |
|
|
Home complete, landscaped, and all permits finaled. ESC permit conditions satisfied.
|
ESC13-01024
| DOC - Permit Finaled | 2/5/2015 | 2/5/2015 | 2/5/2015 9:52:00 AM | P | PASS |
|
|
|
ESC14-00767
| Aging Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 9:15:29 AM | | PASS |
|
|
WIP. Permit posted. Gravel parking area has been installed along shoulder. No MS4 infrastructure on Allumbaugh. Lot is below grade of road. No trackout or sediment leaving site. Approved.
|
ESC14-00798
| General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 8:53:37 AM | | PASS |
|
|
|