BLD16-00126
| BLD-Framing/Rough-in | 2/5/2016 | 2/5/2016 | 2/5/2016 3:54:54 PM | P | CANC |
|
|
Dan Phone #: ###-####
|
BLD16-00032
| BLD-Framing/Rough-in | 2/5/2016 | 2/5/2016 | 2/5/2016 3:54:21 PM | P | PASS |
|
|
Interior steel stud framed walls ok.
|
BLD14-03415
| BLD-Framing/Rough-in | 2/5/2016 | 2/5/2016 | 2/5/2016 3:26:50 PM | P | PART |
|
|
Paul Phone #: ###-####. interior steel stud walls and hardlids ok. Noted that transfer shower does not have the required 48 inch clearance from control wall.
|
BLD16-00234
| BLD-Final | 2/2/2016 | 2/5/2016 | 2/5/2016 2:22:58 PM | P | PASS |
|
|
Rodney// please call before Phone #: ###-####. Ok for perm occ.
|
BLD15-01921
| BLD-Framing/Rough-in | 2/5/2016 | 2/5/2016 | 2/5/2016 2:10:57 PM | P | FAIL |
|
|
Kent Phone #: ###-####. Provide truss enginering for framing inspection. Providte the required48 inch clearance on transfer shower from control wall. Provide membrane penetration protection on can lights. Provide additional details on how to provide continous 1hr. protection on ceiling at archway. All penetrating items through the double top plates shall be protected with an approved 1hr. listed fire stop. Correction notice posted.
|
BLD15-02867
| BLD-Final | 2/3/2016 | 2/5/2016 | 2/5/2016 10:42:36 AM | A | PASS |
|
|
would like call ahead; Kelly Phone #: ###-####
|
BLD15-02867
| DOC - Permit Finaled | 2/5/2016 | 2/5/2016 | 2/5/2016 10:42:29 AM | P | PASS |
|
|
|
BLD16-00264
| BLD-Final | 2/4/2016 | 2/5/2016 | 2/5/2016 9:13:43 AM | A | NH |
|
|
Kibrom Phone #: ###-####. No access, doors locked.
|
BLD15-02855
| BLD-Foundation | 2/5/2016 | 2/5/2016 | 2/5/2016 9:00:25 AM | A | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|