ELE19-00427
| Permanent Service | 2/4/2019 | 2/5/2019 | 2/5/2019 2:13:44 PM | P | PASS |
|
|
Call Clay with any questions ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s o/h rec ok
|
ELE18-04783
| Final | 2/5/2019 | 2/5/2019 | 2/5/2019 2:13:28 PM | P | PASS |
|
|
Code box is to left of front door. 2010 Phone #: ###-#### Inspection requested via web by Jason Wicks Final ok
|
ELE19-00285
| Final | 2/4/2019 | 2/5/2019 | 2/5/2019 12:21:19 PM | A | PASS |
|
|
Solutions have been made. I think we will be ready for final about 11:30am Phone #: ###-#### Inspection requested via web by Dylan Pierce Overhead conductors re-ran to make clearences for hot tub. Final ok
|
ELE19-00285
| Permanent Service | 2/5/2019 | 2/5/2019 | 2/5/2019 12:21:11 PM | P | PASS |
|
|
Solutions have been made. I think we will be ready for final about 11:30am Phone #: ###-#### Inspection requested via web by Dylan Pierce p/s o/h rec ok
|
ELE19-00400
| Final | 2/4/2019 | 2/5/2019 | 2/5/2019 10:40:45 AM | A | PASS |
|
|
There is a key on the outside basement door at the bottom of the stairs. Please call Clay to meet you ###-#### If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Final ok
|
ELE19-00440
| Electrical Rough-In | 2/5/2019 | 2/5/2019 | 2/5/2019 10:40:17 AM | A | PASS |
|
|
come through second side door left side of house. Phone #: ###-#### Inspection requested via web by Robert Schroder Kitchen,laundry @ bath ok to cover
|
ELE18-04264
| Final | 2/4/2019 | 2/5/2019 | 2/5/2019 9:28:27 AM | A | PASS |
|
|
Bill-call 20 minutes prior to meet Phone #: ###-#### Final ok
|
ELE19-00426
| Electrical Rough-In | 2/4/2019 | 2/5/2019 | 2/5/2019 9:13:46 AM | A | PASS |
|
|
Wall, Rough-in Inspection. Chad VanOrden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Wall added to split office with 1 switch installed ok to cover
|