Inspections for the day of: Wednesday, February 5, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02733 BLD-Final2/4/20202/5/20202/6/2020 8:33:31 AMAFAIL
R311.7.5.1 Riser- open risers... does not permit passage of a 4" sphere...
R311.7.5.2 Treads- greatest traeddepth... shall not exceed 3/8"...
BLD19-02559 BLD-Energy code compliance2/3/20202/5/20202/5/2020 5:05:55 PMPPASS
Late as possible please. Insulation on for same day. Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD19-03892 BLD-Ceiling Grid Inspection2/4/20202/5/20202/5/2020 5:05:44 PMPPASS
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
BLD19-04333 BLD-Footing2/5/20202/5/20202/5/2020 5:05:32 PMPNR
Need Geo approval for soil subgrade at garage wall, west side...
BLD19-04138 BLD-Other2/4/20202/5/20202/5/2020 5:04:27 PMPPASS
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD19-04138 DOC - Permit Finaled2/5/20202/5/20202/5/2020 5:04:17 PMPPASS
BLD20-00060 BLD-Footing2/5/20202/5/20202/5/2020 5:04:07 PMPPASS
Work in progress...
Frost protection is required...
BLD19-04365 BLD-Framing/Rough-in2/5/20202/5/20202/5/2020 5:03:33 PMPPASS
OK to insulate
BLD19-03304 BLD-Framing/Rough-in2/4/20202/5/20202/5/2020 11:41:43 AMAPASS
Omar Phone #: ###-####
BLD19-03306 BLD-Framing/Rough-in2/4/20202/5/20202/5/2020 11:41:25 AMAPASS
Omar Phone #: ###-####
BLD19-01793 BLD-Energy code compliance2/4/20202/5/20202/5/2020 11:41:13 AMAPASS
Phone #: ###-#### Inspection requested via web by Laz Ponce
BLD19-01773 BLD-Energy code compliance2/4/20202/5/20202/5/2020 11:40:48 AMAPASS
Phone #: ###-#### Inspection requested via web by Laz Ponce
BLD19-03847 BLD-Other2/4/20202/5/20202/5/2020 10:02:08 AMADEFR
Snow covered roof, rescheduled for 7Feb20...
BLD19-01792 BLD-Energy code compliance2/4/20202/5/20202/5/2020 7:51:18 AMACANC
Phone #: ###-#### >> Inspection requested via web by Laz Ponce Inspection cancelled from web by: Laz Ponce