BLD18-02733
| BLD-Final | 2/4/2020 | 2/5/2020 | 2/6/2020 8:33:31 AM | A | FAIL |
|
|
R311.7.5.1 Riser- open risers... does not permit passage of a 4" sphere... R311.7.5.2 Treads- greatest traeddepth... shall not exceed 3/8"...
|
BLD19-02559
| BLD-Energy code compliance | 2/3/2020 | 2/5/2020 | 2/5/2020 5:05:55 PM | P | PASS |
|
|
Late as possible please. Insulation on for same day. Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD19-03892
| BLD-Ceiling Grid Inspection | 2/4/2020 | 2/5/2020 | 2/5/2020 5:05:44 PM | P | PASS |
|
|
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD19-04333
| BLD-Footing | 2/5/2020 | 2/5/2020 | 2/5/2020 5:05:32 PM | P | NR |
|
|
Need Geo approval for soil subgrade at garage wall, west side...
|
BLD19-04138
| BLD-Other | 2/4/2020 | 2/5/2020 | 2/5/2020 5:04:27 PM | P | PASS |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04138
| DOC - Permit Finaled | 2/5/2020 | 2/5/2020 | 2/5/2020 5:04:17 PM | P | PASS |
|
|
|
BLD20-00060
| BLD-Footing | 2/5/2020 | 2/5/2020 | 2/5/2020 5:04:07 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD19-04365
| BLD-Framing/Rough-in | 2/5/2020 | 2/5/2020 | 2/5/2020 5:03:33 PM | P | PASS |
|
|
OK to insulate
|
BLD19-03304
| BLD-Framing/Rough-in | 2/4/2020 | 2/5/2020 | 2/5/2020 11:41:43 AM | A | PASS |
|
|
Omar Phone #: ###-####
|
BLD19-03306
| BLD-Framing/Rough-in | 2/4/2020 | 2/5/2020 | 2/5/2020 11:41:25 AM | A | PASS |
|
|
Omar Phone #: ###-####
|
BLD19-01793
| BLD-Energy code compliance | 2/4/2020 | 2/5/2020 | 2/5/2020 11:41:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
BLD19-01773
| BLD-Energy code compliance | 2/4/2020 | 2/5/2020 | 2/5/2020 11:40:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
BLD19-03847
| BLD-Other | 2/4/2020 | 2/5/2020 | 2/5/2020 10:02:08 AM | A | DEFR |
|
|
Snow covered roof, rescheduled for 7Feb20...
|
BLD19-01792
| BLD-Energy code compliance | 2/4/2020 | 2/5/2020 | 2/5/2020 7:51:18 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Laz Ponce Inspection cancelled from web by: Laz Ponce
|