PLM00-03202
| Storm Drains | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 13:05:40. Contact: ###-####. rd stubout at col 24 ok 2/6/2001 11:26:57 AM
|
PLM00-04412
| Final | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 09:15:51. Contact: ###-####. test all bfp's, thermon expantion protection too small, water to rtu's incomplete, set all equipment, calk all fixtures, overflow more than 2" above roof drain, cut excess roof membrain from roof drain body, vent terminates within 10' of fresh air intake. 2/6/2001 5:23:31 PM
|
PLM00-03956
| Final | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
terry 2pm terrys part final ok 2/6/2001 3:36:07 PM
|
PLM00-03670
| Roof Drains | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 10:42:08. Contact: ###-####. left col ok right has a bad pipe 2/6/2001 4:15:57 PM
|
PLM00-04403
| Plumbing Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 2/6/2001 3:53:17 PM 3 rd stubs out of the building
|
PLM99-04006
| Final | 2/2/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 07:41:42. Contact: ###-####.
|