Inspections for the day of: Tuesday, February 6, 2001.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-03202 Storm Drains2/5/20012/6/20012/6/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/05/2001 at 13:05:40. Contact: ###-####. rd stubout at col 24 ok 2/6/2001 11:26:57 AM
PLM00-04412 Final2/6/20012/6/20012/6/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/06/2001 at 09:15:51. Contact: ###-####. test all bfp's, thermon expantion protection too small, water to rtu's incomplete, set all equipment, calk all fixtures, overflow more than 2" above roof drain, cut excess roof membrain from roof drain body, vent terminates within 10' of fresh air intake. 2/6/2001 5:23:31 PM
PLM00-03956 Final2/6/20012/6/20012/6/2001 12:00:00 AMPPART
terry 2pm terrys part final ok 2/6/2001 3:36:07 PM
PLM00-03670 Roof Drains2/6/20012/6/20012/6/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/06/2001 at 10:42:08. Contact: ###-####. left col ok right has a bad pipe 2/6/2001 4:15:57 PM
PLM00-04403 Plumbing Rough-in2/6/20012/6/20012/6/2001 12:00:00 AMPPART
Added by Inspector: 330 On 2/6/2001 3:53:17 PM 3 rd stubs out of the building
PLM99-04006 Final2/2/20012/6/20012/6/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/02/2001 at 07:41:42. Contact: ###-####.