ELE01-00145
| Electrical Rough-In | 2/1/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | FAIL |
|
|
LATE AM \\CALL FIRST ###-####. called first as request for access, no answer, left message to reschedule. 2/6/2001 11:48:04 AM
|
ELE00-04831
| Final | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | CANC |
|
|
no access; left card, no message phone available. 2/6/2001 9:20:26 AM
|
ELE00-02929
| Electrical Rough-In | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 324 On 2/5/2001 1:12:39 PM garage ###-####. owners request; will reschedule. 2/6/2001 9:04:43 AM
|
ELE00-04102
| Rough-In Permanent Service | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 15:42:12. Contact: ###-####. main service switch gear.
p/s oh r quantum elec. #4102 (meter/main service in alley). 2/6/2001 2:11:20 PM
|
ELE00-00669
| Final | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PART |
|
|
temp occ for the fifth floor Mike ###-####. suite #507; correction posted: 210-52. additional recepticle required in liv.rm. ok for temp. occup. 2/6/2001 11:20:16 AM
|
ELE01-00357
| Electrical Rough-In | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 07:46:16. Contact: ###-####. correct location is: 1205 W. BANNOCK ST 2/6/2001 3:30:15 PM 2/6/2001 3:30:45 PM
|
ELE01-00210
| Final | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
###-####. conference; garage code requirements for branch circuits. 2/6/2001 3:05:52 PM
|
ELE00-03768
| Final | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 09:54:25. Contact: ###-####. completed. correct address is : 1206 W. BANNOCK ST. 2/6/2001 3:50:05 PM
|
ELE01-00150
| Final | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 10:25:33. Contact: ###-####. 2/6/2001 3:42:21 PM. temporary occupancy.
|
ELE00-02929
| Electrical Rough-In | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PART |
|
|
###-####. conference; branch circuits in garage, 2/6/2001 1:57:28 PM
|