Inspections for the day of: Tuesday, February 6, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02522 BLD-Final2/2/20012/6/20012/6/2001 12:00:00 AMAPASS
Melony ###-####
c of c #19895 issued 2/6/2001 10:28:06 AM
BLD00-03185 BLD-Footing2/5/20012/6/20012/6/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/05/2001 at 09:47:44. Contact: ###-####.
special on site, Gary w/ mti// wip, verbal corrections to be taken care of b-4 pour, south and west wall and interior pads pending report from special 2/6/2001 9:47:01 AM
BLD00-01086 BLD-Energy code compliance2/5/20012/6/20012/6/2001 12:00:00 AMAPART
Yeon ###-####
rim joists ok and seal package 2/6/2001 3:40:31 PM
BLD00-03033 BLD-Framing/Rough-in2/5/20012/6/20012/6/2001 12:00:00 AMAFAIL
Scheduled by Inspector: 415 On 2/5/2001 2:52:04 PM
ext. shear ok,,, need to redo party wall w/ draft stops @ 10' intervals 2/6/2001 10:08:22 AM
BLD00-02726 BLD-Final2/5/20012/6/20012/6/2001 12:00:00 AMPFAIL
###-####
c/n posted, trades 2/6/2001 2:35:36 PM
BLD00-02420 BLD-Framing/Rough-in2/6/20012/6/20012/6/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/06/2001 at 08:35:43. Contact: ###-####.
interior walls in rear ok to cover 2/6/2001 4:03:55 PM
BLD00-01086 BLD-Framing/Rough-in2/6/20012/6/20012/6/2001 12:00:00 AMPPART
Scheduled by Inspector: 415 On 2/6/2001 10:29:43 AM
most every thing ok, pending letter from engineer, ok to insulate , see c/n at energy code inspection 2/6/2001 3:42:22 PM
MEC00-03508 Final2/6/20012/6/20012/6/2001 12:00:00 AMPFAIL
###-####
c/n posted,, need to finish all componets 2/6/2001 1:48:42 PM