BLD00-02290
| BLD-Final | 2/2/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 15:07:49. Contact: ###-####. c/n issued--Tempered glass is needed at landing. 2/6/2001 10:21:22 AM
|
BLD00-03144
| BLD-Foundation | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | CANC |
|
|
###-#### Contractor re-scheduled for 2/5/01 via calling inspector. 2/5/2001 1:50:24 PM
|
BLD01-00119
| BLD-Footing | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PASS |
|
|
DAve ###-#### they will pour tomorrow at 10am
|
BLD00-03673
| BLD-Framing/Rough-in | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PASS |
|
|
Gary ###-####. ok to side-shear nailing 2/6/2001 11:14:13 AM
|
BLD00-03565
| BLD-Other | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 18:06:22. Contact: ###-####. Shear ok 2/6/2001 9:00:09 AM
|
BLD00-03638
| BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 420 On 2/6/2001 10:34:04 AM ok to insulate--needs mechanical r.i. prior to cover.
|
BLD00-03601
| BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | FAIL |
|
|
###-####c/n issued--missing hd's (4) in front. Mispositioned hd's (2 in front), additional nailing required. 2/6/2001 2:19:22 PM
|
BLD00-03572
| BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | NR |
|
|
###-####No approved plans on site. 2/6/2001 2:53:56 PM
|
BLD00-03522
| BLD-Framing/Rough-in | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | PASS |
|
|
MArk ###-#### ok to insulate 2/6/2001 1:03:37 PM
|
BLD00-03440
| BLD-Framing/Rough-in | 2/5/2001 | 2/6/2001 | 2/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 14:04:09. Contact: . c/n issued--air seal package needed, draftstop on hor. chase, fire block each side of fireplace, Provide truss gable detail for review. 2/6/2001 3:50:05 PM
|