Inspections for the day of: Wednesday, February 6, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00223 Water and/or Sewer2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
###-####
PLM01-03641 Water and/or Sewer2/5/20022/6/20022/6/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/05/2002 at 14:10:00. Contact: ###-####. main water trunk line with branch lines,s and ball valves test ok 2/6/2002 10:59:45 AM
PLM02-00271 Plumbing Rough-in2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
JEAN ###-####
PLM02-00272 Plumbing Rough-in2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
JEAN ###-####
PLM02-00210 Groundwork2/5/20022/6/20022/6/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/05/2002 at 15:55:24. Contact: ###-####. bathroom group and trunk line to front of building air test ok still need to finish sewer line to sewer ejector and intercepter 2/6/2002 4:48:53 PM
PLM01-03820 Final2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
CORT ###-####
PLM02-00196 Plumbing Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/06/2002 at 08:17:18. Contact: ###-####.
PLM02-00286 Water and/or Sewer2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
###-#### early pm if possible
PLM01-02107 Plumbing Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/06/2002 at 11:10:07. Contact: ###-####. D.W.V. water test on section 1 and 2 - floor,s 1 through 4 ok. water ( air test ) from manabloc to room,s on floor,s 3 and 4 ok 2/6/2002 5:56:20 PM
PLM01-02106 Plumbing Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/06/2002 at 11:10:56. Contact: ###-####. D.W.V. water test section,s 1 through 3, floor,s 1 through 4 ok water-air test from manabloc to room,s on floor,s 3 and 4 ok 2/6/2002 5:53:14 PM
PLM01-02105 Plumbing Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPART
Scheduled by Inspector: 360 On 2/6/2002 5:57:54 PM water ( air test ) from manabloc to room,s on 3 and 4 floor ok. 2/6/2002 6:03:58 PM
PLM02-00241 Plumbing Rough-in2/5/20022/6/20022/6/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/05/2002 at 16:37:29. Contact: ###-####.
PLM01-03820 Final2/5/20022/6/20022/6/2002 12:00:00 AMPPASS
CORT ###-####