Inspections for the day of: Wednesday, February 6, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02405 BLD-Final2/5/20022/6/20022/6/2002 12:00:00 AMAFAIL
###-#### Stairs in garage still beyond allowable tolerance . 2/6/2002 10:38:31 AM
BLD02-00148 BLD-Foundation2/5/20022/6/20022/6/2002 12:00:00 AMAPART
JAY ###-#### wip--40% ready at time of inspection 2/6/2002 9:58:39 AM
BLD01-02457 BLD-Other2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/05/2002 at 13:50:08. Contact: . SHEAR-ok to side 2/6/2002 10:23:39 AM
BLD01-02512 BLD-Final2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
###-#### ed
BLD01-03179 BLD-Framing/Rough-in2/5/20022/6/20022/6/2002 12:00:00 AMAPASS
JASON - ###-#### Interior shear--ok 2/6/2002 10:57:01 AM
BLD02-00193 BLD-Foundation2/5/20022/6/20022/6/2002 12:00:00 AMPPART
JACK ###-#### wip--80% ready at time of inspection. 2/6/2002 2:01:50 PM
BLD01-03258 BLD-Footing2/6/20022/6/20022/6/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/06/2002 at 07:50:04. Contact: ###-####. wip-35% ready 2/6/2002 2:32:32 PM
BLD02-00142 BLD-Framing/Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPART
###-#### FOUNDATION-NOT FRAMING--wip--95% ready at time of inspection. 2/6/2002 1:45:31 PM
MEC02-00320 Final2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/06/2002 at 08:42:31. Contact: ###-####.
BLD01-02765 BLD-Final2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
###-#### GARY ACCESS TO LOCK BOX 10956 c. of c. #22154 issued. 2/6/2002 12:58:45 PM
MEC02-00301 Rough-in2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/06/2002 at 09:40:32. Contact: ###-####.
BLD02-00153 BLD-Footing2/6/20022/6/20022/6/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/06/2002 at 10:10:35. Contact: ###-####. No contractor on site-- 2/6/2002 1:31:13 PM
BLD01-02405 BLD-Final2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
allan-- ###-#### fn occ c. of c. issued 2/6/2002 2:46:46 PM
BLD02-00145 BLD-Footing2/6/20022/6/20022/6/2002 12:00:00 AMPPART
Scheduled by Inspector: 420 On 2/6/2002 1:44:27 PM Forms moved to comply with required setbacks. 80% ready at time of inspection. 2/6/2002 1:47:04 PM
BLD01-03282 BLD-Other2/6/20022/6/20022/6/2002 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 2/6/2002 1:44:53 PM SHEAR-ok to side 2/6/2002 2:22:31 PM