BLD02-01611
| BLD-Final | 2/5/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, c/n : f.p., plbg finals....ladder at egress well, handrail, need plan & eng'g. 2/6/2003 11:06:38 AM
|
BLD02-01164
| BLD-Framing/Rough-in | 2/5/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | PART |
|
|
dennis or ###-#### work; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie... ok to side shell; will need elec permit for cover when ready, homeowner job. 2/6/2003 12:15:01 PM
|
MEC03-00310
| Rough-in | 2/5/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 16:03:43. Contact: ###-####.--key under rock to right side of front door
|
MEC03-00310
| Pressure Test | 2/5/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 16:04:06. Contact: ###-####.-key on right side under rock by front door ... Csst extension to existing ok..> 20# 2/6/2003 11:20:28 AM
|
BLD02-02599
| BLD-Foundation | 2/6/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2003 at 06:54:24. Contact: ###-####....wall steel ok 2/6/2003 9:18:58 AM
|
BLD02-03102
| BLD-Conference | 2/6/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | A | PASS |
|
|
w/ 350 re htg...will ok when done partial ok for w.i.p. at grid. 2/6/2003 11:23:08 AM
|
BLD01-01377
| BLD-Framing/Rough-in | 2/6/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung....tunnel corridor w 2/6/2003 3:54:56 PM ip 2/6/2003 3:55:06 PM
|
BLD02-01348
| BLD-Final | 2/3/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | P | PASS |
|
|
###-####\\after 1:30
|
BLD02-02687
| BLD-Other | 2/4/2003 | 2/6/2003 | 2/6/2003 12:00:00 AM | P | NR |
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs NEEDS DRAIN INSPECTION... site drainage req's Pub. Wks. 2/6/2003 2:37:30 PM
|