MEC03-02627
| Final | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | A | PASS |
|
|
sherri ###-####--call 1st for access
|
MEC03-02485
| Final | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | A | PASS |
|
|
sherri ###-####--call 1st for access
|
MEC04-00329
| Rough-in | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | A | PASS |
|
|
denton; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD03-02864
| BLD-Energy code compliance | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 5:57:21 PM. Contact: ###-####. Need energy calcs with approved plans on site. 2/6/2004 10:06:43 AM
|
BLD03-02854
| BLD-Framing/Rough-in | 2/6/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | P | FAIL |
|
|
###-#### terry
c/n posted 2/6/2004 3:18:37 PM
|
BLD03-02063
| BLD-Framing/Rough-in | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 11:20:57 AM. Contact: ###-####. Need to complete penetration seal at top plate where drop ceiling occur. Need additional 1 3/4 x 117/8 LVL second level floor. See note 3. Need to complete front entry framing. Fire blocking at pantry drop ceiling. 2/6/2004 4:38:24 PM
|
MEC04-00347
| Rough-in | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | P | FAIL |
|
|
###-#### justin
c/n posted 2/6/2004 3:18:05 PM
|
MEC04-00347
| Pressure Test | 2/5/2004 | 2/6/2004 | 2/6/2004 12:00:00 AM | P | PASS |
|
|
|