Inspections for the day of: Monday, February 6, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-00195 Rough-in2/6/20062/6/20062/6/2006 3:50:07 PMPFAIL
disregard previous rough inspection entry,
still need outside air and flex duct installed per installation instructions, this was noted on first c/n
MEC06-00195 Pressure Test2/6/20062/6/20062/6/2006 3:48:37 PMPPASS
Denton -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00195 Rough-in2/6/20062/6/20062/6/2006 3:32:40 PMPPASS
Denton -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
waiting for smoke detectors installed at fsd
MEC05-04274 Final1/31/20062/6/20062/6/2006 3:16:29 PMPFAIL
Rough-in final -- Please contact job foreman, Matt Benton - ###-####. Internet Inspection Request from: RaChelle Meister
left c/n at general contractors trailer
MEC06-00387 Final2/6/20062/6/20062/6/2006 2:27:06 PMPPASS
Sue will be home. Please call before going out. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00387 Pressure Test2/6/20062/6/20062/6/2006 2:26:37 PMPPASS
Sue will be home. Please call before going out. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00304 Final2/6/20062/6/20062/6/2006 2:05:56 PMPFAIL
Final; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
c/n posted on furnace
MEC05-02374 Final2/3/20062/6/20062/6/2006 9:29:20 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
need to locate secondary drain from furnace in attic