BLD06-00105
| BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 3:02:41 PM | P | PASS |
|
|
Troy -- for permanent occupancy pending fire line safety final; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. ok for perm occ.
|
BLD05-02198
| BLD-Energy code compliance | 2/6/2006 | 2/6/2006 | 2/6/2006 2:17:45 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen
|
BLD05-02416
| BLD-Other | 2/6/2006 | 2/6/2006 | 2/6/2006 1:59:44 PM | P | PASS |
|
|
stem wall inspection//matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD06-00171
| BLD-Concrete | 2/6/2006 | 2/6/2006 | 2/6/2006 1:39:37 PM | P | PART |
|
|
tim ###-####//requests 2pm. Ustick to columbine or fairview to shamrock.
|
BLD05-03423
| BLD-Energy code compliance | 2/6/2006 | 2/6/2006 | 2/6/2006 1:08:08 PM | P | PASS |
|
|
Joe -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-01276
| BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 10:44:22 AM | P | CANC |
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Inspection cancelled from web by: Elizabeth Esong
|
BLD05-01532
| BLD-Conference | 2/3/2006 | 2/6/2006 | 2/6/2006 10:08:44 AM | A | DONE |
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Met with contractor and truss engineer on site with proper truss package.
|
BLD04-02020
| BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 9:47:20 AM | A | NR |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs other finals prior to bldg. final.
|
BLD05-03297
| BLD-Other | 2/3/2006 | 2/6/2006 | 2/6/2006 9:36:08 AM | A | PASS |
|
|
Call Carl for access, Ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Carl Madsen. ok pending elec. and mech. ri insp. above grid. c/n posted on site.
|
BLD05-03378
| BLD-Framing/Rough-in | 2/3/2006 | 2/6/2006 | 2/6/2006 9:06:33 AM | A | PART |
|
|
Darren -- for ceiling grid insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Grid in place is floating, plans show fixed. In place system is ok, but contractor needs to follow with approval from architect of work in place.
|