FIR05-00479
| INSP-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 5:34:05 PM | P | FAIL |
|
|
Per Brian the first floor and second floors are now complete. Third and fourth floors will be started tomorrow.
|
BLD06-01694
| FIRE-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 4:14:06 PM | P | FAIL |
|
|
Need suite number, fire extinguisher and the doors/hardware installed.
|
FIR06-00874
| INSP-Sprinkler Rough-in | 2/6/2007 | 2/6/2007 | 2/6/2007 3:51:00 PM | P | FAIL |
|
|
Inspection was for just the office areas not the pre-action area. The office areas can not be covered yet due to insulation falling from the deck and creating obstructions to the upright sprinkler heads. Also an upright needs to be added in the west restroom due to an overspacing issue. The plans need to be resubmitted to the city for approval due to the amount of additional upright heads on the pre-action system. Many of these heads are in the hydraulic remote area.
|
FIR07-00004
| INSP-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 3:19:03 PM | P | FAIL |
|
|
Need ceiling tile installed and approved plans on site for me to verify that what is should be.
|
FIR07-00079
| INSP-Sprinkler Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 3:08:08 PM | A | FAIL |
|
|
I stopped at this project twice today. The first time the job shack was locked up and the general contractor and fire sprinkler contractor were not here. The second time I stopped the general contractor was here but he did not have the approved underground plans. He called Shilo and they faxed over unstamped drawings as I waited. I left after telling the general contractor not to cover the trench and to get the approved plans on site.
|
BLD05-03068
| FIRE-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 1:38:32 PM | P | FAIL |
|
|
Life safety finaled - fire dept access road still an issue per troy
|
FIR06-00592
| INSP-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 1:13:15 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00957
| INSP-Sprinkler Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 12:44:24 PM | A | PART |
|
|
The second floor of C wing will be ok to cover when the insulation is installed between the walls and the drop downs to the dry sidewalls. Also one pendant is overspaced as marked on the plans. C wing attic dry system 200 lb hydro test passed.
|
FIR06-00749
| INSP-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 12:29:26 PM | A | PASS |
|
|
permit finaled
|
FIR06-00929
| INSP-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 11:02:38 AM | A | PART |
|
|
ceilings are ok to cover but a ceiling or the walls will need to extend to the deck in the mechanical room and there will need to be a separation at the coolers as well.
|
BLD05-01295
| FIRE-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 10:39:16 AM | A | FAIL |
|
|
It does not appear that any notes were read as requested on the previous inspection. Exit signs are missing at the main exits. Existing exit lights are inoperative. Closures have not been installed. Occupant load sign has not been provided. Knox box is not provided and so on.
|
BLD06-00995
| FIRE-Final Inspection | 2/6/2007 | 2/6/2007 | 2/6/2007 8:44:28 AM | P | PASS |
|
|
Life safety finaled
|
BLD06-00996
| FIRE-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 8:39:53 AM | A | PART |
|
|
Temp only. Life safety will be ok to final when fire alarm permit for building B is complete.
|
BLD06-00993
| FIRE-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 8:36:33 AM | A | PASS |
|
|
Life safety passed
|
FIR06-00922
| INSP-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 8:35:36 AM | A | PART |
|
|
Temp only until building B is complete
|
FIR06-00925
| INSP-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 8:34:44 AM | A | PASS |
|
|
permit finaled
|
FIR06-00923
| INSP-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 8:33:42 AM | A | PASS |
|
|
permit finaled
|
FIR05-00738
| INSP-Final Inspection | 2/5/2007 | 2/6/2007 | 2/5/2007 4:44:17 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|