MEC07-00382
| Final | 2/6/2007 | 2/6/2007 | 2/6/2007 4:20:33 PM | P | PASS |
|
|
Installer will be there, homeowner Jackie ###-####, any issues please call Lynn at ###-####, thank you. Phone #: ###-####
|
MEC06-03751
| Final | 2/6/2007 | 2/6/2007 | 2/6/2007 3:55:56 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2007 at 10:38:47 AM. Contact: ###-####.
|
MEC07-00426
| Rough-in | 2/6/2007 | 2/6/2007 | 2/6/2007 3:20:29 PM | P | PASS |
|
|
this permit is for 2 fireplaces. Thanks!
|
MEC07-00125
| Final | 2/6/2007 | 2/6/2007 | 2/6/2007 2:35:03 PM | P | PASS |
|
|
DANNY PAGER #99105 Phone #: ###-####
|
MEC06-03530
| Final | 2/6/2007 | 2/6/2007 | 2/6/2007 2:29:59 PM | P | PASS |
|
|
Final Phone #: ###-####
|
MEC07-00309
| Final | 2/1/2007 | 2/6/2007 | 2/6/2007 12:11:13 PM | A | FAIL |
|
|
marylyn; Phone #: ###-#### Internet Inspection Request from: Darla Downs T&P to be piped to garage floor
|
MEC06-04373
| Rough-in | 2/6/2007 | 2/6/2007 | 2/6/2007 12:10:30 PM | A | FAIL |
|
|
The reinspect R I will be on the House - the shop will also need a R.I. and Pressure Test still need to maintain 1" clearance with insulation shield, and need seperate permit for shop and attach to BLD for shop
|
MEC07-00406
| Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 12:09:32 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/5/2007 at 5:19:10 PM. Contact: ###-####.
|
MEC07-00402
| Final | 2/5/2007 | 2/6/2007 | 2/6/2007 11:40:41 AM | A | PASS |
|
|
Please call Karl if you ahve any questions! Phone #: ###-####
|
MEC07-00150
| Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 10:48:37 AM | A | PASS |
|
|
Phone #: ###-#### 20# test
|
MEC07-00413
| Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 9:55:18 AM | A | PASS |
|
|
We were told to pull one permit for both sides of this duplex (215 & 219 Latah).
|
MEC06-04366
| Final | 2/5/2007 | 2/6/2007 | 2/6/2007 9:37:05 AM | A | FAIL |
|
|
JOB CONTACT: JAYSON T Phone #: ###-#### vent gas regulator, revise permit to show hydronic system
|
MEC07-00421
| Final | 2/5/2007 | 2/6/2007 | 2/6/2007 8:43:22 AM | A | PASS |
|
|
Tool Hook-up Phone #: ###-####
|
MEC07-00418
| Final | 2/5/2007 | 2/6/2007 | 2/6/2007 8:43:11 AM | A | PASS |
|
|
Tool Hook-up Phone #: ###-####
|
MEC07-00030
| Pressure Test | 2/5/2007 | 2/6/2007 | 2/6/2007 8:24:06 AM | A | CANC |
|
|
4 plex Phone #: ###-#### x201
|