FIR08-00017
| INSP-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 4:59:31 PM | P | PASS |
|
|
The sprinkler piping is ok to cover.
|
BLD07-03108
| FIRE-Final Inspection | 2/6/2008 | 2/6/2008 | 2/6/2008 4:58:32 PM | P | PASS |
|
|
Life safety passed.
|
BLD07-02823
| FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 3:58:00 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00009
| INSP-Final Inspection | 2/6/2008 | 2/6/2008 | 2/6/2008 3:56:12 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00070
| INSP-Sprinkler Rough-in/Hydro | 2/6/2008 | 2/6/2008 | 2/6/2008 3:55:15 PM | P | PASS |
|
|
The undergrond supply pipe is ok to be buried. This the only item inspected today.
|
FIR07-00213
| INSP-Sprinkler Rough-in/Hydro | 2/5/2008 | 2/6/2008 | 2/6/2008 1:54:54 PM | A | PASS |
|
|
The sprinkler piping is ok to cover. Contractor provided Brian Johnson revised hydraulic calculations. The fire sprinkler contractor still needs to provide resubmittals for all of the changes that have occured prior to a final inspection for this project.
|
FIR08-00023
| INSP-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 1:19:06 PM | P | PASS |
|
|
Permit finaled
|
BLD07-03055
| FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 12:03:32 PM | A | PASS |
|
|
Life safety passed.
|
BLD07-03054
| FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 12:03:05 PM | A | PASS |
|
|
Life safety passed
|
BLD07-00629
| FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 11:52:05 AM | A | PASS |
|
|
Life safety passed
|
FIR06-00011
| INSP-Alarm Testing | 2/5/2008 | 2/6/2008 | 2/6/2008 10:14:27 AM | A | DONE |
|
|
The second floor corridor/cafeteria is complete.
|
BLD08-00102
| FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 9:54:15 AM | A | PART |
|
|
A temporary occupancy was given with sam rogers permisson. The existing chimes had a sound level between 65 and 70 db. Fire extinguishers, exit lights and emergency lighting is in place. The fire alarm permit will need to be finaled prior to a final inspection for this building permit.
|