ELE09-00202
| Electrical Rough-In | 2/6/2009 | 2/6/2009 | 2/6/2009 3:05:05 PM | P | PASS |
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten ok
|
ELE09-00204
| Permanent Service | 2/6/2009 | 2/6/2009 | 2/6/2009 2:12:20 PM | P | PASS |
|
|
Dave Phone #: ###-#### p/s o/h rec ok
|
ELE09-00204
| Final | 2/6/2009 | 2/6/2009 | 2/6/2009 2:11:51 PM | P | PASS |
|
|
Dave Phone #: ###-#### ok
|
ELE09-00203
| Electrical Rough-In | 2/6/2009 | 2/6/2009 | 2/6/2009 2:11:28 PM | P | PASS |
|
|
Dave Phone #: ###-#### r/i u/g ok
|
ELE08-02740
| Electrical Rough-In | 2/6/2009 | 2/6/2009 | 2/6/2009 1:04:56 PM | P | PART |
|
|
this is for the mezzenne ceiling cover call Andy on site at ###-#### for walk thru Phone #: ###-#### Internet Inspection Request from: Don Lustig walls and ceilings ok anop
|
ELE09-00194
| Electrical Rough-In | 2/5/2009 | 2/6/2009 | 2/6/2009 12:12:38 PM | A | FAIL |
|
|
sub panel ###-#### called corr posted BCC 4-05-32 no violations to br retained #1, 240.15 & 240.83(E) shall use factory handle ties, if breakers are approved for dual voltage, if not replace them #2, 200.6&7 shall not use white wire as phase conductor #3, 310.15 T shall derate conductors where required by code noted #4, 110.26(F)(2) shall remove phone equipment from below new subpanel
|
ELE09-00175
| Electrical Rough-In | 2/6/2009 | 2/6/2009 | 2/6/2009 10:37:58 AM | A | PART |
|
|
walls in x-ray ok
|
ELE09-00198
| Temporary Service | 2/5/2009 | 2/6/2009 | 2/6/2009 8:44:37 AM | A | PASS |
|
|
jerod Phone #: ###-#### t/s u/g new ok
|
ELE09-00202
| Final | 2/6/2009 | 2/6/2009 | 2/6/2009 7:32:52 AM | P | CANC |
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten Inspection cancelled from web by: gary batten
|
ELE09-00194
| Electrical Rough-In | 2/5/2009 | 2/6/2009 | 2/5/2009 2:42:49 PM | P | PART |
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten have ? on use of breakers for 3 phase, and white wire used as phase
|