Inspections for the day of: Friday, February 6, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01656 FIRE-Conference2/6/20092/6/20092/6/2009 4:13:48 PMADONE
I went over inspection procedures and order of completion with the superintendant.
FIR08-00791 INSP-Final Inspection2/6/20092/6/20092/6/2009 4:12:48 PMPFAIL
Not all of the sprinkler work is complete. Forward flush passed. Tim Frost is ok with the relocation of the PIV from the landscape/island to the exterior wall. The electric alarm bell is missing.
FIR08-00779 INSP-Final Inspection2/6/20092/6/20092/6/2009 4:10:58 PMPFAIL
The original panel was replaced after it was blown up due to high voltage backfeed from the ansul suppression system. The duct smoke detectors did not shut down the hvac units. The backflow preventor tamper switch needs to be on a separate zone which will cause modifications to the existing zone arrangement. As-builts are required but plan resubmittals are not. An updated map for the facp is required as well. The system will need to be retested once the zones have been redone.
FIR08-00852 INSP-Final Inspection2/6/20092/6/20092/6/2009 4:07:02 PMPFAIL
The front hood suppression system installation is not complete yet. No testing was performed.
FIR09-00018 INSP-Sprinkler Rough-in2/3/20092/6/20092/6/2009 4:05:41 PMPPASS
See the approved plans for locations where the sprinkler piping can be covered. I noted two quick responce upright heads that will need to be changed to standard responce and the earthquake bracing attacments are not utilizing through bolts as required per NFPA 13 for wood members.
BLD08-02584 FIRE-Final Inspection2/6/20092/6/20092/6/2009 2:27:26 PMPPASS
Life safety passed
BLD08-02585 FIRE-Final Inspection2/6/20092/6/20092/6/2009 2:27:08 PMPPASS
Life safety passed
BLD08-02583 FIRE-Final Inspection2/6/20092/6/20092/6/2009 2:26:50 PMPPASS
Life safety passed
BLD08-02036 FIRE-Final Inspection2/4/20092/6/20092/6/2009 12:01:51 PMACANC
No inspection was performed due to the project related fire alarm not being complete.
FIR08-00757 INSP-Final Inspection2/5/20092/6/20092/6/2009 12:01:20 PMAFAIL
Per Scotty the project is not ready for inspection.
FIR08-00864 INSP-Sprinkler Rough-in/Hydro2/5/20092/6/20092/6/2009 10:19:58 AMAFAIL
Provide a hydro test for the new portion of the sprinkler system since it includes 22 sprinkler heads and can be isolated. Provide as-builts showing the piping changes and the additional pendants in the remote area. Replace the flat face(hex)bushings and provide on piece reducing fittings. Provide access to the inside of the coolers to verify storage heights and sprinkler obstructions. Provide verification of the annual inspection on the sprinkler system.
FIR08-00864 INSP-Sprinkler Rough-in2/5/20092/6/20092/5/2009 3:08:48 PMACANC
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick