Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-01037 General Inspection2/5/20092/6/20092/6/2009 3:50:00 PMAPASS
ESC08-01016 General Inspection2/5/20092/6/20092/6/2009 3:49:43 PMAPASS
ESC08-00516 Tracking Control2/5/20092/6/20092/6/2009 3:13:03 PMAPASS
11am
ESC08-00706 Tracking Control2/5/20092/6/20092/6/2009 3:12:53 PMAPART
wILL BE STREET SWEEPING ON ALL STREET AT THE END OF THE DAY.
ESC08-00491 Site Preparation2/3/20092/6/20092/6/2009 1:15:41 PMAFAIL
Have closed off majority of the spots where violations were occuring. The area on the west end will be blocked of with chainlink by next week. D. I. maintenance still needs to occur. Also when tracking gets excessive scraping is occuring. Will re-inspect on 2/13/09.
ESC08-00750 General Inspection2/4/20092/6/20092/6/2009 11:07:17 AMAPART
To contractor and developer to provide a concrete washout pit.
ESC08-00763 General Inspection2/4/20092/6/20092/6/2009 11:07:05 AMAPART
To contractor and developer to provide a concrete washout pit.
ESC08-00737 BMP Violation2/6/20092/6/20092/6/2009 10:06:18 AMAFAIL
Spoke with RP aand told him to re-install new wattles along the lot to the west where they destroyed them. Told him this will be his final notice and that a stop work order will beplaced on his project if not correct by 2/9/08 PM. Inspector #380 will-reinspect on 2/10/09 PM.
ESC08-00457 General Inspection2/4/20092/6/20092/6/2009 8:40:51 AMAPART
Need to clean up minor tracking off of access of Atlantic st. Also dress up both construction access points for the project.
Will re-inspect on 2/13/09.