ESC11-00879
| General Inspection | 2/6/2013 | 2/6/2013 | 2/7/2013 12:50:03 PM | | FAIL |
|
|
VErbal to RP: Maintain sediment control through out the project area.
|
ESC12-01202
| Tracking Control | 2/6/2013 | 2/6/2013 | 2/6/2013 4:27:07 PM | P | CANC |
|
|
|
ESC11-00176
| General Inspection | 2/6/2013 | 2/6/2013 | 2/6/2013 4:24:15 PM | | FAIL |
|
|
Verbal to RP; Provide a sediment barrier a the stock pile along the gutterpan.
|
ESC11-00525
| BMP Violation | 2/6/2013 | 2/6/2013 | 2/6/2013 4:23:41 PM | P | FAIL |
|
|
Correction Notice Posted(message to RP) 1.Install sedimentbarrierswhere there is a potential for run off. 2. Repair all rills that have developed due to run off. 3. Clean up all sediment and debris offof the hard surfaces. 4. Maintain all storm drain inlets pretaining to the project. Will re-inspect on 2/8/2013
|
ESC12-00370
| Aging Inspection | 2/6/2013 | 2/6/2013 | 2/6/2013 4:20:19 PM | | FAIL |
|
|
Correction Notice Posted(Verbal to RP) 1. Clean up all hard surfaces of all sediment and debris. 2. Provide sediment barriers back of curb on project to prevent any turbid run off coming off of the lot. 3. Maintain storm drain inlets. Will re-inspect on 2/7/2013 PM
|
ESC11-00732
| General Inspection | 2/6/2013 | 2/6/2013 | 2/6/2013 7:59:33 AM | | DONE |
|
|
NO activity.
|