Inspections for the day of: Thursday, February 6, 2014.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00524 INSP-Sprinkler Rough-in2/6/20142/6/20142/6/2014 5:18:05 PMPPART
Okay for ceiling cover.
FIR14-00032 INSP-Final Inspection2/6/20142/6/20142/6/2014 4:56:58 PMPPART
Phase one area sprinkler work passed inspection.
FIR13-00608 INSP-Sprinkler Rough-in2/5/20142/6/20142/6/2014 4:51:34 PMPPART
Okay to cover corridor and elevator lobby grid ceilings east side 6th floor.
FIR13-00580 INSP-Sprinkler Rough-in2/5/20142/6/20142/6/2014 1:01:03 PMAPART
Overhead fire sprinkler work at endo #1 and procedure rooms as marked on stamped plans approved for cover. Revised drawings to be provided at next inspection for branchline routing changes due to building/system zone separation.
BLD13-03435 FIRE-Final Inspection2/5/20142/6/20142/6/2014 12:56:43 PMAPASS
Life safety okay for final pending building address is posted and one EM light at the basement level is repaired.
FIR13-00252 INSP-Final Inspection2/5/20142/6/20142/5/2014 12:00:00 AMACANC
jonathan Phone #: ###-#### // cancelled per Jonothan, will call back to reschedule 2/5/14 leg