FIR14-00531
| INSP-Sprinkler Rough-in | 2/5/2015 | 2/6/2015 | 2/6/2015 3:44:06 PM | A | PART |
|
|
Rough-in inspection completed for living units only at tower 2 podium level. Install incomplete at the common area room 241. Also okayed prior C/N items at the 3rd and 4th floors tower 2. Note: * Damaged main and branchlines due to overheating by proximity to temporary jobsite heating appliances on the 2nd thru 5th floor corridors tower one to be replaced as discussed.*
|
FIR15-00026
| INSP-Final Inspection | 2/5/2015 | 2/6/2015 | 2/6/2015 3:34:03 PM | A | PART |
|
|
Overhead fire sprinkler modifications approved for cover at the grid ceilings.
|
FIR14-00919
| INSP-Final Inspection | 2/5/2015 | 2/6/2015 | 2/6/2015 3:30:42 PM | A | PART |
|
|
Overhead rough-in inspection passed. Need to provide matched response heads as noted.
|
FIR14-00304
| INSP-Conference | 2/5/2015 | 2/6/2015 | 2/6/2015 11:57:34 AM | A | DONE |
|
|
Regarding sprinkler coverage at the corridor north side of annex one.
|