ELE14-02371
| Electrical Rough-In | 2/6/2015 | 2/6/2015 | 2/6/2015 11:37:23 AM | P | PASS |
|
|
Re-inspection on IL area ''F'' on rooms that had broken receptacle boxes. Call Lonny when on-site. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum rough-in area to be inspected completed rough-in ok cover
|
ELE14-01814
| Electrical Rough-In | 2/6/2015 | 2/6/2015 | 2/6/2015 11:36:25 AM | P | PASS |
|
|
Re-inspection bathrooms 151; 152 and Corridor 110 in ''D'' Commons area. Call Lonny when on-site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum rough-in area to be inspected completed, rough-in ok cover
|
ELE15-00215
| Permanent Service | 2/6/2015 | 2/6/2015 | 2/6/2015 9:31:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Edwards p/s u/g rec ok
|
ELE14-03457
| Electrical Rough-In | 2/5/2015 | 2/6/2015 | 2/6/2015 9:04:41 AM | A | PASS |
|
|
Underground at NE corner near loading bay. rough-in ok cover
|