BLD16-03443
| BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 4:20:57 PM | P | DEFR |
|
|
Shear // Sam Phone #: ###-####
|
BLD16-03057
| BLD-Final | 2/6/2017 | 2/6/2017 | 2/6/2017 4:20:13 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner need ele
|
BLD16-02985
| BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 3:26:03 PM | P | PART |
|
|
Luna Phone #: ###-#### front 2 oc 8pp with 3,, blk/ all the rest of house ok to wrap.
|
BLD16-03143
| BLD-Final | 2/6/2017 | 2/6/2017 | 2/6/2017 3:07:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD16-03143
| DOC - Permit Finaled | 2/6/2017 | 2/6/2017 | 2/6/2017 3:07:24 PM | P | PASS |
|
|
|
BLD16-04330
| BLD-Conference | 2/6/2017 | 2/6/2017 | 2/6/2017 2:19:31 PM | P | PART |
|
|
Phone #: ###-#### patch 2hr wall/ lever knob at back office exit door.
|
BLD16-03359
| BLD-Final | 2/3/2017 | 2/6/2017 | 2/6/2017 2:05:14 PM | P | PASS |
|
|
Terry-final on building 1 for temp c of o Phone #: ###-####
|
BLD16-03040
| BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 1:21:44 PM | P | PASS |
|
|
Joe Phone #: ###-#### sheer and soffit ok
|
BLD16-01944
| BLD-Framing/Rough-in | 2/3/2017 | 2/6/2017 | 2/6/2017 10:53:53 AM | A | PASS |
|
|
bill Phone #: ###-####
|
BLD16-03754
| BLD-Framing/Rough-in | 2/3/2017 | 2/6/2017 | 2/6/2017 10:12:06 AM | A | PART |
|
|
Jeannette Phone #: ###-#### c/n 3ply bgirder nailling/ overbuild stagered support spaced per engineering. ok to insulate
|