FIR16-00716
| INSP-Final Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 2:22:24 PM | P | PASS |
|
|
Permit finaled. Also tested the tamper switch
|
BLD16-04330
| FIRE-Final Inspection | 2/2/2017 | 2/6/2017 | 2/6/2017 1:25:34 PM | A | FAIL |
|
|
Provide permit/sprinkler modifications for the overspaced pendant heads, provide final inspection/testing of the outstanding 2014 fire alarm permit, provide verification of an existing racking permit.
|
NAF16-00010
| INSP-Sprinkler Rough-in | 2/2/2017 | 2/6/2017 | 2/6/2017 12:00:55 PM | A | PART |
|
|
See the city approved plans for the seven apartments, 1st/2nd floors, where rough-in is passed and piping can be covered. One apartment as noted on the 1st floor can not be covered since the piping to the FDC has not been installed. Piping in the breeze way can not be covered until the heat tape is verified.
|
BLD16-02808
| FIRE-Final Inspection | 2/3/2017 | 2/6/2017 | 2/6/2017 10:05:36 AM | A | PASS |
|
|
Life safety and fire dept access not effected by the scope of work. Passed.
|