BLD99-03694
| BLD-Framing/Rough-in | 2/7/2000 | 2/7/2000 | 2/8/2000 12:00:00 AM | A | PASS |
|
|
|
BLD99-03530
| BLD-Framing/Rough-in | 2/4/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | PASS |
|
|
sheer panel Matt ###-####
|
BLD99-02934
| BLD-Foundation | 2/7/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | PART |
|
|
###-#### early pm-- hold downs not installed per plan incomplete and part per Hattrick's memo.
|
BLD00-00021
| BLD-Framing/Rough-in | 2/7/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | FAIL |
|
|
###-#### sheer not ok to plan
|
BLD99-02447
| BLD-Framing/Rough-in | 2/7/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | FAIL |
|
|
Fire sprinkler not done- per Russ and memo call for frame after fire sprinkler inspection.
|
BLD99-03561
| BLD-Wall cover | 2/7/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2000 at 10:23:40. Contact: .
|
BLD00-00157
| BLD-Footing | 2/7/2000 | 2/7/2000 | 2/7/2000 12:00:00 AM | P | PASS |
|
|
Dane ###-####
|