BLD00-03522
| BLD-Energy code compliance | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | FAIL |
|
|
mARK ###-#### hangers to small for truss loading replace. 2/7/2001 5:47:53 PM
|
BLD00-03573
| BLD-Wall cover | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 12:27:52. Contact: ###-####. ok pending ele and plm. 2/7/2001 9:14:36 AM
|
BLD00-03398
| BLD-Final | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Please let me know if the bond can be released.
|
BLD00-03398
| BLD-Final | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Please let me know if the bond can be released.
|
BLD00-02437
| BLD-Framing/Rough-in | 2/7/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 08:49:38. Contact: ###-####. drinking foutian requied/ele boxe back to back/two layer must turn at door assembly/fire stop above bathroom hard ceillings for penatrations in tunnel corridor/ pending all other insp aprovals call for reinsp for idems listed. 2/7/2001 5:15:36 PM
|
BLD00-03522
| BLD-Energy code compliance | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | FAIL |
|
|
###-#### truss hanger loads to large for truss reaction. 2/7/2001 5:48:34 PM
|
BLD00-01563
| BLD-Concrete | 2/5/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 06:45:14. Contact: ###-####. placed with special insp. pending report. 2/7/2001 3:53:03 PM
|