PLM01-00002
| Final | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Greg ###-####
|
PLM00-04403
| Roof Drains | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 12:35:41. Contact: ###-####. 3 rd stubs up thru slab and just out of the foundation west side 2/7/2001 8:38:06 AM
|
PLM01-00268
| Water and/or Sewer | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-03670
| Plumbing Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 2/6/2001 4:15:25 PM rd front right column ok 2/7/2001 11:46:59 AM
|
PLM00-03573
| Plumbing Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 16:54:28. Contact: . this inspection wasn't called in by ediger, some other contractor must have entered the wrong number 2/7/2001 9:19:21 AM
|