Inspections for the day of: Wednesday, February 7, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02752 BLD-Foundation2/6/20012/7/20012/7/2001 12:00:00 AMAPART
re-bar Bill ###-#### pouring concrete at 11; int col. ftgs; also has spec insp report for epoxy inserts 2/7/2001 11:26:44 AM
BLD00-02441 BLD-Final2/6/20012/7/20012/7/2001 12:00:00 AMAFAIL
Summers Funeral Home ###-####
BLD99-02394 BLD-Conference2/7/20012/7/20012/7/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/7/2001 11:09:26 AM w/ Carr const re t/i & finals
BLD00-03635 BLD-Conference2/7/20012/7/20012/7/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 2/7/2001 11:31:43 AM w/ foreman; still need eng'g for fl framing; ok to rock remainder
BLD00-03031 BLD-Footing2/7/20012/7/20012/7/2001 12:00:00 AMPPASS
John Wyman ###-#### walkway 2/7/2001 5:02:07 PM
BLD00-01772 BLD-Final2/7/20012/7/20012/7/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 2/7/2001 2:51:04 PM need elec...recall
BLD00-01631 BLD-Conference2/7/20012/7/20012/7/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 2/7/2001 4:22:50 PM w/ contractor & Ron Hill onsit, verbal c/n : submit eng's & spec. insp. reports; need report for framing substitutions timberstrand for M>Lams, fasten joists added at south portion of bsmt
BLD00-03615 BLD-Framing/Rough-in2/7/20012/7/20012/7/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/07/2001 at 07:13:33. Contact: ###-####. shear nailing ok 2/7/2001 5:26:04 PM
BLD00-03155 BLD-Foundation2/6/20012/7/20012/7/2001 12:00:00 AMPPART
###-####
bldg a walls, set back appears ok; ok to set hd bolts. 2/7/2001 5:55:49 PM