ELE01-00145
| Electrical Rough-In | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PART |
|
|
late am ###-####. patio/sun-room walls ele r/i. 2/7/2001 11:19:02 AM
|
ELE01-00357
| Electrical Rough-In | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 15:07:36. Contact: ###-####.. conference: parking lot lighting, meter/main disconnect location. 2/7/2001 10:26:22 AM
|
ELE01-00320
| Electrical Rough-In | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
###-#### please call to set up time. outside receiving/storeage produce area ele r/i. 2/7/2001 10:44:17 AM
|
ELE00-02929
| Electrical Rough-In | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
ready 10 am ###-####. 1st level, garage r/i. 2/7/2001 9:14:04 AM
|
ELE01-00355
| Final | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
###-####. installed recepticle outlet in existing office. 2/7/2001 9:50:13 AM
|
ELE00-04565
| Electrical Rough-In | 2/7/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PASS |
|
|
after 11 am ###-####. pvc conduit feeders in trench, ok. 2/7/2001 2:08:00 PM
|
ELE01-00253
| Electrical Rough-In | 2/7/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:38:33. Contact: ###-####. residential dwelling remodel ele r/i.
ok 2/7/2001 3:55:11 PM
|
ELE00-01971
| Electrical Rough-In | 2/7/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:57:55. Contact: ###-####.. exterior recessed cans; bump-out areas ele r/i.. 2/7/2001 2:49:18 PM
|