BLD00-03651
| BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | FAIL |
|
|
FR INSP CHRIS-- ###-#### cn posted 2/7/2001 12:35:29 PM
|
BLD00-03572
| BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 420 On 2/6/2001 2:53:29 PM cn posted 2/7/2001 11:52:53 AM
|
MEC00-03903
| Final | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 16:56:18. Contact: ###-####. needs fireplace instructions 2/7/2001 12:50:19 PM
|
MEC01-00194
| Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 17:08:19. Contact: ###-####. check comb air at final 2/7/2001 12:35:12 PM
|
MEC01-00194
| Pressure Test | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 17:08:44. Contact: ###-####.
|
BLD01-00196
| BLD-Footing | 2/7/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PART |
|
|
###-#### Jerry hole looks good 2/7/2001 1:50:17 PM
|
BLD00-03638
| BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 16:36:34. Contact: ###-####.
|
BLD00-03638
| BLD-Energy code compliance | 2/6/2001 | 2/7/2001 | 2/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 16:38:41. Contact: ###-####.
|