BLD01-01993
| BLD-Final | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-02102
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
ok to cover, pend other insps...verify ratings for ext efis (smoke/flame) when onsite...75/450 max. 2/7/2002 11:26:21 AM
|
BLD02-00123
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
ok to cover. 2/7/2002 11:26:59 AM
|
BLD01-01993
| BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/7/2002 11:29:29 AM ok to cover, verify efis specs when onsite; 75/450 max
|
BLD01-03156
| BLD-Conference | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/7/2002 11:45:37 AM w/ Guho supt...widen stairs as req'd in plan notes
|
BLD00-03729
| BLD-Conference | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | CANC |
|
|
Added by Inspector: 340 On 2/7/2002 2:04:46 PM ok to rock bsmt walls; chk firestops as completed; fix exit passage & 4 hr wall at elec penetrations
|
BLD01-03258
| BLD-Foundation | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 07:51:26. Contact: ###-####. chk int ftg& shearwall at crawl 2/8/2002 9:27:02 AM
|
MEC02-00332
| Final | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 07:46:20. Contact: ###-####. horiz offset exceeds 25% of rise, see c/n 2/7/2002 3:15:39 PM
|
BLD01-02425
| BLD-Energy code compliance | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 08:33:15. Contact: ###-####....walls ok, 2/7/2002 3:07:36 PM
|