BLD02-00143
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PASS |
|
|
NORA ###-#### SHEER NAIL and framing--ok to side and cover pending elec. r. i. approval. 2/7/2002 11:26:07 AM
|
BLD01-02372
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 13:38:55. Contact: . ok to insulate--c/n posted--rotation block plus truss package needed to inspect roof framing. 2/7/2002 8:56:29 AM
|
MEC02-00354
| Pressure Test | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02926
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 17:09:45. Contact: ###-####. 2--C/N posted--one for shear and one for framing--do not insulate and do not side. 2/7/2002 10:02:15 AM
|
BLD02-00153
| BLD-Foundation | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 17:35:22. Contact: ###-####. wip 2/7/2002 11:13:49 AM
|
BLD01-02901
| BLD-Framing/Rough-in | 2/5/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | A | PART |
|
|
brain ###-#### Ext. shear ok--missing hd at rear--(8) to be verified at framing--interior shear needed at later dater. ok to cover ext. 2/7/2002 10:28:26 AM
|
BLD01-02993
| BLD-Final | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PASS |
|
|
fn occ jeff ###-#### c. of c. #22156 issued 2/7/2002 3:15:57 PM
|
BLD01-02697
| BLD-Final | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 08:28:05. Contact: . 2/7/2002 2:08:26 PM-Plumbing final not completed-no inspection performed. 2/7/2002 2:08:52 PM
|
BLD01-03155
| BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
###-#### c/n--ok to insulate 2/7/2002 2:00:34 PM
|
BLD02-00145
| BLD-Foundation | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
###-#### wip--95 % ready all but hd. 2/7/2002 3:01:55 PM
|
BLD01-03153
| BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 10:39:07. Contact: . c/n--ok to insulate 2/7/2002 2:22:56 PM
|
BLD02-00114
| BLD-Footing | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
###-#### wip--90% 2/7/2002 2:50:47 PM
|
BLD01-03133
| BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | FAIL |
|
|
FR INSP ###-####- OFFICE OR TROY ###-#### c/n posted 2/7/2002 1:07:45 PM
|