Inspections for the day of: Thursday, February 7, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS00-00136 BLD-Conference1/31/20022/7/20022/7/2002 12:00:00 AMANR
Scheduled by Inspector: 340 On 1/31/2002 3:35:02 PM talked with carl d owner of bld out of town 2/7/2002 1:12:12 PM
BLD00-03212 BLD-Final2/6/20022/7/20022/7/2002 12:00:00 AMAPASS
###-#### PLEASE CALL 1ST. ok for c.c 2/7/2002 1:14:27 PM
BLD00-03729 BLD-Framing/Rough-in2/6/20022/7/20022/7/2002 12:00:00 AMAPART
BRUCE ###-#### base ment and second level stell stud framing ok carl d walked project wiyh me and bruce 2/7/2002 1:14:05 PM
BLD01-03150 BLD-Energy code compliance2/6/20022/7/20022/7/2002 12:00:00 AMAPASS
###-#### ok to cover 2/7/2002 1:14:45 PM
MEC02-00347 Pressure Test2/7/20022/7/20022/7/2002 12:00:00 AMAPASS
Added by Inspector: 425 On 2/7/2002 8:56:13 AM
BLD01-02493 BLD-Final2/6/20022/7/20022/7/2002 12:00:00 AMPPASS
###-#### garage code 2310 c.c # 20991 issued 2/8/2002 11:17:19 AM
MEC02-00325 Pressure Test2/7/20022/7/20022/7/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/07/2002 at 07:53:24. Contact: ###-####.
BLD01-01428 BLD-Final2/7/20022/7/20022/7/2002 12:00:00 AMPPASS
late pm ###-#### c.c # 20989 issued 2/8/2002 11:15:20 AM
BLD01-02444 BLD-Framing/Rough-in2/6/20022/7/20022/7/2002 12:00:00 AMPPASS
###-#### call first ok to insulate still needs to nail above straps on out side 2/8/2002 11:16:42 AM
MEC02-00334 Pressure Test2/5/20022/7/20022/7/2002 12:00:00 AMPPASS
###-#### A-1