BLD01-00621
| FIRE-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | NR |
|
|
contractor was not ready for inspection 2/7/2002 5:21:21 PM
|
FIR01-00621
| INSP-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
sprinkler rough-in ok. sprinklers ok for cover 2/7/2002 10:54:54 AM
|
FIR02-00033
| INSP-Sprinkler Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PART |
|
|
sprinkler piping ok for cover 2/7/2002 1:19:15 PM
|
BLD01-01951
| FIRE-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | PASS |
|
|
Life/safety finaled. Notified contractor to change door hardware in basement corridor 2/7/2002 3:30:10 PM
|
BLD01-01172
| FIRE-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 430 On 2/7/2002 12:26:28 PM Fire extinguishers need to be tagged. Door hardware, exit signs and emergency lights OK. Fire alarm to be tested later
|