Inspections for the day of: Friday, February 7, 2003.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02625 BLD-Final2/6/20032/7/20032/7/2003 12:00:00 AMAPASS
###-#### bill please call 1st C/C issued. 2/7/2003 11:53:26 AM
BLD03-00165 BLD-Final2/6/20032/7/20032/7/2003 12:00:00 AMAPASS
###-#### bill call 1st C/C issued. 2/7/2003 11:53:39 AM
BLD02-02301 BLD-Final2/6/20032/7/20032/7/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/6/2003 at 3:03:34 PM. Contact: ###-####.gar code 5221 C/C issued. 2/7/2003 11:08:06 AM
BLD02-02761 BLD-Conference2/7/20032/7/20032/7/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/7/2003 at 7:06:35 AM. Contact: ###-####. Talked about change on plans. 2/7/2003 11:07:33 AM
BLD02-02301 BLD-Final2/7/20032/7/20032/7/2003 12:00:00 AMAPASS
BLD02-01796 BLD-Framing/Rough-in2/7/20032/7/20032/7/2003 12:00:00 AMPFAIL
###-#### scott C/N posted....OK to insulate (forgot to sticker) 2/7/2003 1:53:23 PM
BLD02-00155 BLD-Framing/Rough-in2/7/20032/7/20032/7/2003 12:00:00 AMPPART
mel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK to cover both sides of Kitch wall between grid lines C&B No electr in upper part this wall. 2/7/2003 1:26:28 PM
BLD01-02557 BLD-Framing/Rough-in2/7/20032/7/20032/7/2003 12:00:00 AMPPASS
BLD01-02557 BLD-Energy code compliance2/7/20032/7/20032/7/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/7/2003 at 10:06:54 AM.
BLD03-00154 BLD-Foundation2/6/20032/7/20032/7/2003 12:00:00 AMPPASS
###-#### carl
BLD02-02739 BLD-Framing/Rough-in2/6/20032/7/20032/7/2003 12:00:00 AMPCANC
allen; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-02739 BLD-Framing/Rough-in2/6/20032/7/20032/7/2003 12:00:00 AMPFAIL
allen; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N.... 2/7/2003 1:27:09 PM
BLD02-02855 BLD-Footing2/6/20032/7/20032/7/2003 12:00:00 AMPPART
###-#### ###-#### 90% footing complete....OK pending insp and approval MTI 2/7/2003 3:14:38 PM
BLD03-00070 BLD-Framing/Rough-in2/6/20032/7/20032/7/2003 12:00:00 AMPPASS
###-#### floyd