Inspections for the day of: Monday, February 7, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-01991 Final2/4/20052/7/20052/7/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/4/2005 at 11:50:58 AM. Contact: ###-####. corrections made, ok to final 2/7/2005 8:09:05 AM
ELE05-00338 Permanent Service2/4/20052/7/20052/7/2005 12:00:00 AMANH
Scheduled by a contractor via Hello! on 2/4/2005 at 12:05:36 PM. Contact: ###-####. no access, called contr. told to call in for pm. 2/7/2005 8:53:37 AM
ELE05-00335 Electrical Rough-In2/4/20052/7/20052/7/2005 12:00:00 AMAPASS
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corrections made, ric ok 2/7/2005 9:45:45 AM
ELE05-00391 Electrical Rough-In2/7/20052/7/20052/7/2005 12:00:00 AMPFAIL
mike ###-#### 230.82 There shall be only service conductors on main lugs. They have no overcurrent protection. 2/7/2005 1:55:49 PM
ELE05-00382 Electrical Rough-In2/7/20052/7/20052/7/2005 12:00:00 AMPPASS
Rick; Phone #: ###-####=-call ahead of time so he can let you in Internet Inspection Request from: Jan Rice ok to cover walls only. told elect to use gnd screws in boxes, not sheet metal. 2/7/2005 2:41:37 PM
ELE05-00338 Permanent Service2/7/20052/7/20052/7/2005 12:00:00 AMPPASS
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore p/s from exst meter pak n ok 2/7/2005 12:52:01 PM
ELE04-02481 Final2/7/20052/7/20052/7/2005 12:00:00 AMPPASS
brad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore checked outside. ok to final. 2/7/2005 3:57:56 PM
ELE04-03006 Electrical Rough-In2/7/20052/7/20052/7/2005 12:00:00 AMPPASS
ok to cover for parking lot lighting