MEC06-00413
| Pressure Test | 2/7/2006 | 2/7/2006 | 2/7/2006 5:14:49 PM | P | PART |
|
|
two test ok far right test failed. no straping in the crawl space yet.
|
MEC06-00298
| Pressure Test | 2/7/2006 | 2/7/2006 | 2/7/2006 4:21:23 PM | P | PART |
|
|
Customer won't be home until 3:00. If inspector can't do it that late then please call Sherry @ ###-#### 30 minutes before going out and she will meet the inspector out there. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt. gas test ok needs to run gas to kitchen when its ready.
|
MEC06-00298
| Rough-in | 2/7/2006 | 2/7/2006 | 2/7/2006 4:20:41 PM | P | PART |
|
|
Customer won't be home until 3:00. If inspector can't do it that late then please call Sherry @ ###-#### 30 minutes before going out and she will meet the inspector out there. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt part ri ok needs to run gas piping to kitchen and what ever exhaust work, ok to cover
|
MEC05-03860
| Pressure Test | 2/7/2006 | 2/7/2006 | 2/7/2006 3:28:34 PM | P | PART |
|
|
This will for the 4th floor.. Please call Steve with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel pressure test heating and cooling loops and unit on the fourth floor and the heating side in 2nd floor at the unit.
|
MEC06-00407
| Pressure Test | 2/7/2006 | 2/7/2006 | 2/7/2006 2:37:46 PM | P | PASS |
|
|
David -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
MEC06-00407
| Rough-in | 2/7/2006 | 2/7/2006 | 2/7/2006 2:37:30 PM | P | PASS |
|
|
David -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
MEC06-00401
| Rough-in | 2/7/2006 | 2/7/2006 | 2/7/2006 2:14:36 PM | P | PASS |
|
|
|
MEC06-00400
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 2:08:16 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch
|
MEC06-00402
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 2:02:47 PM | P | PASS |
|
|
Internet Inspection Request from: Shelley Baisch
|
MEC06-00403
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 1:57:05 PM | P | PASS |
|
|
Internet Inspection Request from: Shelley Baisch
|
MEC06-00393
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 1:47:31 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Frank Marturello
|
PLM06-00342
| Water and/or Sewer | 2/7/2006 | 2/7/2006 | 2/7/2006 1:27:39 PM | P | PART |
|
|
Doug -- for sewer only; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong sewer ok
|
PLM06-00343
| Water and/or Sewer | 2/7/2006 | 2/7/2006 | 2/7/2006 1:26:49 PM | P | PART |
|
|
Doug -- for sewer only; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong sewer ok
|
MEC05-03993
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 12:15:46 PM | A | PART |
|
|
homeowner Alysya ###-####, any issues please call Lynn at ###-####, thank you.; Phone #: ###-#### Internet Inspection Request from: Stephanie Smith ashleys ac is ok but the existing new furnace has the single wall flue too close to the wooden floor joists, owner will try to find out who installed it and get it corrected or have ashley do it.
|
MEC05-04099
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 11:54:47 AM | A | PART |
|
|
Please call Greg 20 minutes before going out. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt down stairs and in floor up stairs ri ok
|
MEC05-04099
| Pressure Test | 2/6/2006 | 2/7/2006 | 2/7/2006 11:52:54 AM | A | PASS |
|
|
Please call Greg 20 minutes before going out. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
MEC06-00289
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 11:29:58 AM | A | PASS |
|
|
Mike Gorringe. Please call 20 minutes before coming.; Phone #: ###-#### Internet Inspection Request from: Monica Henderson
|
MEC06-00007
| Final | 2/7/2006 | 2/7/2006 | 2/7/2006 11:01:58 AM | A | PASS |
|
|
|
MEC05-04301
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 11:01:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 11:51:00 AM. Contact: ###-####.
|
MEC06-00008
| Final | 2/7/2006 | 2/7/2006 | 2/7/2006 11:01:11 AM | A | PASS |
|
|
|
MEC05-04299
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 11:00:55 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 11:51:57 AM. Contact: ###-####.
|
PLM06-00341
| Water and/or Sewer | 2/7/2006 | 2/7/2006 | 2/7/2006 10:34:42 AM | P | PASS |
|
|
larry ###-####
|
MEC05-03441
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 9:56:20 AM | A | PASS |
|
|
house should be unlocked; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
MEC06-00399
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 9:43:39 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch
|
MEC06-00404
| Rough-in | 2/7/2006 | 2/7/2006 | 2/7/2006 9:43:27 AM | P | PASS |
|
|
This permit was accidentally missed when scheduling inspections for the others in Dundee - if you could do this with the rest it would save you a trip. Thanks! Internet Inspection Request from: Shelley Baisch
|
MEC06-00396
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 9:43:06 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch
|
MEC06-00184
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 9:41:59 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:26:58 PM. Contact: ###-####. holes in return, complete exh fans, bad joint in b-vent, insulation shield, combustion air, make up air for dryer
|
MEC06-00185
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 9:39:09 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:28:19 PM. Contact: ###-####. holes in return, complete exh fans, insulation shield, combustion air, make up air for dryer
|
MEC06-00191
| Rough-in | 2/6/2006 | 2/7/2006 | 2/7/2006 9:37:58 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:29:13 PM. Contact: ###-####. 1" clearance to b-vent. make up air for dryer, exh fans incomplete, insulation shield, combustion air.
|
MEC06-00191
| Pressure Test | 2/6/2006 | 2/7/2006 | 2/7/2006 9:36:39 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:29:49 PM. Contact: ###-####.
|
MEC06-00185
| Pressure Test | 2/6/2006 | 2/7/2006 | 2/7/2006 9:36:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:28:00 PM. Contact: ###-####.
|
MEC06-00184
| Pressure Test | 2/6/2006 | 2/7/2006 | 2/7/2006 9:36:05 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 3:26:36 PM. Contact: ###-####.
|
MEC05-03313
| Final | 2/6/2006 | 2/7/2006 | 2/7/2006 8:37:35 AM | A | NH |
|
|
House is vacant key will be on elecrical main if not please call Chris at number above. Thank you!! Veronica; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
PLM06-00341
| Final | 2/7/2006 | 2/7/2006 | 2/7/2006 12:00:00 AM | P | PASS |
|
|
larry ###-####
|
PLM06-00337
| Water and/or Sewer | 2/6/2006 | 2/7/2006 | 2/6/2006 2:09:43 PM | A | PASS |
|
|
###-#### Michelle
|
PLM06-00335
| Water and/or Sewer | 2/6/2006 | 2/7/2006 | 2/6/2006 2:09:10 PM | A | PASS |
|
|
###-#### Michelle
|
PLM06-00336
| Water and/or Sewer | 2/6/2006 | 2/7/2006 | 2/6/2006 2:04:57 PM | A | PASS |
|
|
###-#### Michelle
|