FIR05-00312
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 4:19:23 PM | P | PART |
|
|
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
|
BLD05-02208
| FIRE-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 4:18:53 PM | P | CANC |
|
|
Left two voice messages but got no reply
|
FIR05-00876
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 4:11:08 PM | P | PART |
|
|
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected. Permit is ready to final when that happens.
|
BLD05-03100
| FIRE-Conference | 2/7/2006 | 2/7/2006 | 2/7/2006 3:38:17 PM | P | DONE |
|
|
I let Doug know that the riser needs its annual inspection verified since the tag has not been punched
|
FIR06-00055
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 3:35:27 PM | P | PASS |
|
|
Fire alarm permit finaled
|
FIR06-00055
| INSP-Alarm Testing | 2/6/2006 | 2/7/2006 | 2/7/2006 3:33:08 PM | A | PASS |
|
|
Fire alarm permit finaled
|
FIR05-00118
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 3:30:34 PM | P | PART |
|
|
Permit previously finled
|
FIR05-00802
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 1:28:51 PM | P | PASS |
|
|
Permit finaled
|
FIR05-00803
| INSP-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 1:28:30 PM | P | PASS |
|
|
Permit finaled
|
FIR05-00803
| INSP-Alarm Testing | 2/7/2006 | 2/7/2006 | 2/7/2006 1:28:04 PM | P | PASS |
|
|
Permit finaled
|
BLD05-03190
| FIRE-Final Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 1:26:06 PM | P | PASS |
|
|
Life safety finaled
|
BLD04-02937
| FIRE-Conference | 2/6/2006 | 2/7/2006 | 2/7/2006 11:39:54 AM | A | DONE |
|
|
Went over life safety notes that apply to the existing church area.
|
FIR05-00118
| INSP-Alarm Testing | 2/6/2006 | 2/7/2006 | 2/7/2006 11:39:16 AM | A | CANC |
|
|
|
FIR06-00033
| INSP-Final Inspection | 2/6/2006 | 2/7/2006 | 2/7/2006 11:38:31 AM | A | PASS |
|
|
Fire sprinkler finaled
|