ESC05-00156
| DOC - Permit Finaled | 2/7/2006 | 2/7/2006 | 2/7/2006 1:37:51 PM | P | PART |
|
|
Final stabilization has been completed.
|
ESC05-00142
| DOC - Permit Finaled | 2/7/2006 | 2/7/2006 | 2/7/2006 1:37:33 PM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-00156
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:37:14 PM | A | CANC |
|
|
|
ESC05-00142
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:37:10 PM | A | CANC |
|
|
|
ESC05-01214
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:36:30 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01393
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:36:20 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01392
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:36:11 PM | A | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01215
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:36:03 PM | A | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01767
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:35:39 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01384
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:35:30 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01974
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:35:21 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01764
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:35:11 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01985
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:35:02 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01216
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:34:54 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01812
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:34:45 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01656
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:34:33 PM | A | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01211
| Tracking Control | 1/24/2006 | 2/7/2006 | 2/7/2006 1:34:24 PM | A | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01975
| Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 1:34:09 PM | P | PART |
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
ESC05-01412
| Complaint Inspection | 2/7/2006 | 2/7/2006 | 2/7/2006 9:45:46 AM | P | FAIL |
|
|
Responded to citizen complaint regarding materials being left in the ROW. Verbal c/n issued to RP about trusses on sidewalk and in ROW, will be cleaned up today. Notified complaintant.
|