FIR14-00036
| INSP-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 4:32:54 PM | P | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
FIR13-00600
| INSP-Sprinkler Rough-in | 2/7/2014 | 2/7/2014 | 2/7/2014 4:30:40 PM | P | PART |
|
|
Fire sprinkler work at the grid ceilings okayed for cover.
|
FIR14-00080
| INSP-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 4:29:12 PM | P | PASS |
|
|
Hood suppression system operated correctly under test conditions. Permit finaled.
|
FIR13-00700
| INSP-Final Inspection | 2/7/2014 | 2/7/2014 | 2/7/2014 4:21:42 PM | P | PASS |
|
|
Scope of fire sprinkler work completed. Permit finaled.
|
FIR13-00677
| INSP-Sprinkler Rough-in | 2/7/2014 | 2/7/2014 | 2/7/2014 4:20:04 PM | P | PART |
|
|
Cover inspection completed for bays 104A and 104B with the exception of one sprinkler not yet installed- ref. dated plan annotation.
|
FIR14-00039
| INSP-Final Inspection | 2/4/2014 | 2/7/2014 | 2/7/2014 3:56:38 PM | A | PASS |
|
|
Fire alarm inspection passed. Permit finaled.
|
BLD13-03263
| FIRE-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 11:16:26 AM | A | PART |
|
|
Phase one TI work at the north half as defined by the temp wall passed life safety walkthrough.
|
FIR13-00579
| INSP-Sprinkler Rough-in | 2/6/2014 | 2/7/2014 | 2/7/2014 11:14:22 AM | A | PART |
|
|
Okay to cover fire sprinkler work at the second floor units- kitchens and bathrooms.
|