Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00690 INSP-Sprinkler Rough-in2/7/20142/7/20142/7/2014 3:33:00 PMPPASS
Sprinkler piping is ok to cover.
FIR13-00522 INSP-Sprinkler Rough-in2/7/20142/7/20142/7/2014 3:19:55 PMPPASS
Tenting passed. Piping can be covered
BLD14-00265 FIRE-Final Inspection2/7/20142/7/20142/7/2014 3:01:26 PMPFAIL
Plans need to be resubmitted/evaluated due to the second exit not exiting to the exterior of the building. It actually exits into an adjoining tenant space that is not shown on the plans. The exit sing over the main exit needs to be repaired and the emergency light located next to it repaired or removed since it is not required per the plans. The fire extinguisher needs to be provided with an annual inspection tag and mounted as discussed. The modification of the secondary exit may require additional exit signs/emergency lights/panic hardware. This could effect the patio gate requirements.
FIR13-00718 INSP-Final Inspection2/7/20142/7/20142/7/2014 2:18:55 PMPPASS
permit finaled
FIR13-00403 INSP-Sprinkler Rough-in/Hydro2/5/20142/7/20142/7/2014 12:02:08 PMAPASS
overhead hydro test passed
FIR14-00072 INSP-Sprinkler Rough-in2/6/20142/7/20142/7/2014 10:18:57 AMAPASS
Rough-in passed. Piping ok to cover
BLD13-02948 FIRE-Final Inspection2/6/20142/7/20142/7/2014 9:45:18 AMACANC
Could not find city approved drawings on stie. Cancel per Nate Phone #: ###-####
BLD13-02947 FIRE-Final Inspection2/6/20142/7/20142/7/2014 9:41:24 AMACANC
I could not find the city approved plans on site. Cancel per Nate Phone #: ###-####.
BLD14-00118 FIRE-Final Inspection2/6/20142/7/20142/7/2014 9:37:27 AMAPASS
Life safety passed. Door hardware to be "turned around" at lobby/corridor separation and to be verified by building inspector.
BLD13-03277 FIRE-Final Inspection2/6/20142/7/20142/7/2014 8:25:54 AMAPASS
Life safety passed
BLD13-03429 FIRE-Final Inspection2/6/20142/7/20142/7/2014 8:03:50 AMAPASS
life safety passed
FIR14-00072 INSP-Sprinkler Rough-in2/7/20142/7/20142/7/2014 7:51:47 AMPFAIL
Access door was locked. Employees would not allow access. Rescheduled for this afternoon if possible.
FIR13-00402 INSP-Sprinkler Rough-in/Hydro2/5/20142/7/20142/6/2014 12:00:00 AMACANC
overhead - jonathan Phone #: ###-#### // cancelled per Jonothan at JBL, will call back to reschedule 2-6-14 leg