Inspections for the day of: Thursday, February 7, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-00602 Conference2/7/20192/7/20192/7/2019 3:26:27 PMPPASS
John Phone #: ###-####...
discussed panel room and location of underground feeds vs panel
ELE18-02445 Final2/6/20192/7/20192/7/2019 2:41:53 PMPPASS
Thomas Phone #: ###-####...ok to final
ELE18-02677 Final2/4/20192/7/20192/7/2019 12:08:40 PMPCANC
we did LED tubes here. can send you cutsheets or meet you here. Phone #: ###-#### Inspection requested via web by Tim Dunlop...
will confirm labelling of fixture before final given
ELE18-02677 Electrical Rough-In2/7/20192/7/20192/7/2019 12:07:46 PMPPASS
we did LED tubes here. can send you cutsheets or meet you here. Phone #: ###-#### Inspection requested via web by Tim Dunlop...
listed lamps confirmed...discussed required labelling of fixture
ELE14-02836 ELE-Aging Inspection2/7/20192/7/20192/7/2019 11:04:27 AM PASS
final scheduled...correction made
ELE14-02836 Final2/7/20192/7/20192/7/2019 11:04:01 AMAPASS
correction completed...ok to final
ELE19-00290 Final2/6/20192/7/20192/7/2019 10:55:07 AMAPASS
Final Inspection for Service Upgrade any Questions Please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller...
panel complete...ok to final
ELE19-00451 Final2/6/20192/7/20192/7/2019 10:37:56 AMAPASS
Phone #: ###-#### Inspection requested via web by William Salts...
ok to final
ELE14-03361 Final2/6/20192/7/20192/7/2019 10:25:39 AMAPASS
Call to be let in // Aaron or contractor ###-#### Mike Phone #: ###-####..
proper material verified
sealoffs done-verified by contractor and site rep
ok to final
ELE19-00463 Electrical Rough-In2/6/20192/7/20192/7/2019 9:28:40 AMAPASS
House is vacant the code to the garage is the house number. Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller...
rough ok to cover
kitchen-island outlets and cans only
master bed-outlets for open walls/create closet
master bath-outlet, vanity light, shower/toilet area
down bed- outlets for open walls
ELE19-00422 Final2/7/20192/7/20192/7/2019 8:32:32 AMAFAIL
Keith Chetta is the electrician for this project. We are requesting our final in conjunction with Old Dominion Solar''s Final Inspection. Thank you! Phone #: ###-#### Inspection requested via web by JENNY EMEL...
1..incomplete labelling on solar fused disconnect and meter base
2..no access to verify breaker in panel
3..conjunction with Old Dominion Solar and their final at same time was not done
ELE19-00203 Final2/7/20192/7/20192/7/2019 12:00:00 AMPCANC
KKP- Elec cancel the final JA
Final Terminations for Owner Provided Equipment Phone #: ###-#### >> Inspection requested via web by Kevin Perez
ELE18-02228 Electrical Rough-In2/4/20192/7/20192/6/2019 7:20:47 AMPCANC
LED wallpacks and poles. I can email cutsheets if needed. all DLC/UL/ETL Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Inspection cancelled from web by: Tim Dunlop