ELE19-04755
| Final | 2/6/2020 | 2/7/2020 | 2/7/2020 3:13:31 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins 210.8- All GFCI devices shall be located in a readily accessible location. Soffit receptacle. 210.8(B)(2)- All receptacle outlets 150 volts to ground up to 100 amp located in kitchen areas shall have GFCI protecion, 3 2 pole receptacles. 210.8(B)(5)- Bar area receptacles located with in 6' of a sink shall have GFCI protection. Inside and outside of bar. 210.62- All show window receptacles shall be located with in 18" of top of windows.
|
ELE19-03488
| Final | 2/6/2020 | 2/7/2020 | 2/7/2020 2:49:59 PM | P | PART |
|
|
Please call Luke for TCO final. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 210.8(B)(1)- All 15 and 20 amp 120 volt receptacle outlets located in bathrooms shall have GFCI protection. Executive bath 1 is 1 is not. 406.3(E)- All non locking-type 125 volt, 15 and 20 amp receptacles that are controlled by an automatic control device for the purpose of energy management or building automation shall be marked with the controlled symbol and the word "controlled". Permenant stamp acceptable. Contractor able to correct without delaying TCO for furniture. TCO for furniture OK
|
ELE19-04907
| Final | 2/6/2020 | 2/7/2020 | 2/7/2020 12:16:41 PM | A | FAIL |
|
|
Electrical final Phone #: ###-#### Inspection requested via web by Deb Morton BCC 4-05-17 Unlawful electrical procedures. (A)- Install or alter any electrical wiring, equipment, apparatus, or fixture without first securing an electrical permit. Receptacle outlets added at verious locations aftere hours by other not covered by this permit. An electrical contractor shall secure permit for work not covered by this scope of work. Marked receptacles in question on this contractor print in red. Wiring for receptacles on level 3 conference rooms 2, 3, 4, 5, 6, and level 5 conference rooms 7, 8, 10 under shelves. Elevevator wiring to be verified by this permit as it is in scope of work.
|
MIS20-00004
| ELE-Conference | 1/31/2020 | 2/7/2020 | 2/7/2020 10:47:54 AM | A | FAIL |
|
|
Manager of US bank very helpful and provided access to panels around right side of teller station. Building maintainance opened panel on right and pneumatic still remains, runs from top to bottom, "T" located near bottom, and exits at 2 locations. Gave building maintainance a card and asked them to call when corrected.
|
ELE20-00364
| Rough-In Permanent Service | 2/6/2020 | 2/7/2020 | 2/7/2020 9:58:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
|
ELE19-04109
| Final | 2/7/2020 | 2/7/2020 | 2/7/2020 9:36:14 AM | A | FAIL |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Troy Ballard 314.25- All boxes shall have covers. Garage door opener receptacle. Multiple receptacles blocked by materials in garage. Garage code did not work, found open door.
|