Inspections for the day of: Tuesday, February 8, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00213 BLD-Footing2/7/20002/8/20002/8/2000 12:00:00 AMAPASS
for gar only ft --ed ###-#### Will remove abs pipe out of footings.
BLD00-00027 BLD-Framing/Rough-in2/7/20002/8/20002/8/2000 12:00:00 AMAPASS
Tyler ###-####
BLD99-03228 BLD-Framing/Rough-in2/7/20002/8/20002/8/2000 12:00:00 AMAFAIL
exterior sheer wall insp Harris construction Phil ###-####
MEC99-03734 Rough-in2/7/20002/8/20002/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/07/2000 at 09:46:05. Contact: ###-####.
BLD00-00089 BLD-Foundation2/7/20002/8/20002/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/07/2000 at 13:23:10. Contact: ###-####. Fnd walls
MEC00-00368 Final2/7/20002/8/20002/8/2000 12:00:00 AMPPASS
###-####
BLD00-00058 BLD-Energy code compliance2/7/20002/8/20002/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/07/2000 at 11:28:55. Contact: ###-####.
BLD00-00007 BLD-Framing/Rough-in2/7/20002/8/20002/8/2000 12:00:00 AMPPASS
Tradewinds ###-####
BLD99-03555 BLD-Conference2/8/20002/8/20002/8/2000 12:00:00 AMPPART
Rod ###-#### just need to submit for a permit addemdum to demolish existing mech room.
MEC99-03727 Final2/8/20002/8/20002/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/08/2000 at 09:27:35. Contact: ###-####.
BLD99-02817 BLD-Framing/Rough-in2/8/20002/8/20002/8/2000 12:00:00 AMPPART
###-#### built fire wall around book case
MEC99-03560 Final2/8/20002/8/20002/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/08/2000 at 10:10:16. Contact: ###-####.